EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wlawrence
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (407)
Introduction
- (1)
Avionics
- (8)
Baffling
- (12)
Canopy
- (40)
-
Finish new latch
-
Fitting Peter Anson...
-
Stop drilling the...
-
Stress cracks
-
Add End Rivets And A...
-
Install Canopy Latch...
-
Finish Gluing Canopy...
-
Replace Canopy Limit...
-
Make Final Canopy...
-
to Secure Right and...
-
Glue Canopy Right...
-
Adjust Spacing...
-
Cut Notch in...
-
Drill Rivet Holes In...
-
Fit Latch for Canopy...
-
Continue Fitting...
-
Continue Fitting...
-
Cut Rear Edge of...
-
Cut Rear Edge of Canopy
-
Begin Fitting New...
-
Continue Canopy Fit...
-
Adjust Canopy Frame...
-
Canopy Outside Latch...
-
Canopy Latch Return...
-
Fitting Canopy Latch...
-
Aligning Canopy...
-
Canoy Latch Fitment...
-
Aligning Latch Pin...
-
Remove Fillet on...
-
Dress Rear Canopy...
-
Canopy Frame...
-
Fit Canopy Frame and...
-
Fit Canopy Rear Bow...
-
Fabrication of...
-
Canopy Bow Brace
-
Fitting Canopy Bows...
-
Canopy Longeron...
-
Harvard Holmes...
-
Canopy Latch
Controls
- (15)
Cowl
- (32)
Dialogue
- (3)
Documentation
- (5)
Empennage
- (1)
Engine
- (95)
Firewall
- (2)
Fuel System
- (27)
Fuselage
- (19)
Glare Shield
- (5)
Inspection
- (1)
Instrument Panel
- (18)
Interior Finish
- (5)
Landing Gear
- (11)
Lighting
Paint / Decals
- (1)
Presentation
- (1)
Project Sale
- (1)
Propeller
- (2)
Research
- (1)
Tail Feathers
Tools
- (1)
Various
- (13)
Windscreen
- (16)
Wings
- (34)
Workshop
- (9)
Ignition
- (28)
Builder Name:
William Lawrence
-
Project:
Sonex
-
VIEW REPORTS
Total Hours:
1884.3
Total Flight Time:
Start/Last Date:
Nov 21, 2018 - No Finish Date
Engine:
Aerovee
Friendly URL:
https://eaabuilderslog.org?s=wlawrence
Home or Last Project Picture
Aug 25, 2020
Fit Canopy Frame and Drill Holes for Rivets (continued)
- (8 hours)
Category: Canopy
Harvard Holmes and Frank Kelly continue to fine tune fit of bows and frame for canopy drilling in preparation for rivets.
Rivets dry fit
Port Fwd final fitting
Frank fine tunes before riveting
Stir stick simulates canopy
Rivets dry fit
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.